ICFs have become the most preferred construction material for green buildings due to their reduced construction
time, compatibility with any inside or outside surface finish, insect resistance, strength, noise reduction,
reduced infiltration, and significant and continuing energy savings. However, the high initial cost of commercial
ICFs, their limitations on concrete placement height and rate as serious concerns. In this paper, a new ICF system
has been developed to address these concerns. The new system is a job-built system that consists of high density
expanded polystyrene boards (EPS) and threaded glass fiber reinforced polymers (GFRP) ties. A full-scale specimen
was built using self- consolidation concrete (SCC) and tested at the structural laboratory. This experiment has
shown the ease and speed of construction of the new system as well as its superior structural capacity and energy
efficiency while being economically comparable.
Introduction
Although Insulated Concrete Form (ICF) was first patented in the US in 1966, the demand for ICF walls in the
last few years has grown exponentially with the dramatic
increase in energy prices. According to the National Association of Home
Builders (NAHB), ICF accounts for roughly 3.0% of the total housing construction market in the US in 2005 (NAHB,
2005). This percentage has significantly increased in the last few years as ICF becomes the most preferred system
for green buildings and sustainable construction. ICF buildings are wind-proof, insect-proof, bullet-proof, more
energy efficient, and significantly stronger than wood-frame homes, while being only 3.0% higher in total
construction cost (Nasvik, 2004). The success of ICF construction is mainly due to the unique properties of
Expanded Polystyrene (EPS) that works as an excellent temperature, moisture, and sound barrier; and strength and
durability properties of reinforced concrete (Doebber & Ellis, 2005).
In spite of the benefits of using ICFs, a study conducted by the Portland Cement Association (PCA) has revealed
that inadequate concrete consolidation in ICF construction and the resulting voids are serious concerns (Gajda
& Dowell, 2003). Significant voids in concrete walls have negative impacts on their durability, thermal
efficiency, and structural performance. According to the PCA report, voids were often noticed around plastic ties,
reinforcing bars, form corners, and lintels due to poor consolidation. The likelihood
of having consolidation problems in ICF construction is much higher than that in
traditional construction due to the difficulty of performing external and/or internal vibration. External vibration
is ineffective in ICF walls because of the damping properties of EPS. Also the narrowness of ICF walls, such as 4
to 6 in. (100 – 150 mm) and the existence of plastic ties every 6 to 8 in. (150 –
200 mm) make internal vibration cumbersome, time-consuming. The other problem that affects the wide use of ICF’s in
the high cost of shipping and storing ICFs forms. Because of the large dimensions of ICF blocks, large number of
trucks is needed for shipping and large area is needed for storage, which significantly intensively increase the
cost of ICF walls.
Self-Consolidation Concrete (SCC) is a new type of high-performance concrete defined by ACI committee 237 on SCC
as: “highly flowable, non-segregating concrete that can spread into place, fill the formwork, and encapsulate the
reinforcement without any mechanical consolidation”. There are several advantages for using SCC in wall
construction: (1) excellent consolidation even in areas with congested steel reinforcement; (2) ease of placement
in hard to reach area as SCC can flow as far as 130 ft from the point of placement: (3) high quality of the
concrete surface making it ideal for architectural applications: (4) SCC is less permeable, develops high early
strength, and provides higher durability than regular concrete.
The objective of this paper is to present the development of an economical job-built ICF system that can be
easily and rapidly installed on site and allow pouring SCC concrete from up to 8 ft. height. The paper is organized
as follows. The next section presents a summary of studies on the pressure of SCC on formwork. The following
section presents the developed system, its materials, design, implementation, testing, and cost analysis. The last
section summarized research conclusions.
Pressure of Self-Consolidating Concrete on Forms
According to Assaad & Khayat (2006), the factors affecting the lateral pressure of SCC on formwork system
are similar as for conventional concrete. It was reported that the rate of decrease of form pressure is highly
dependent on the mixture composition (e.g. volume of course aggregate). It was also reported that temperature has
insignificant effect on the initial pressure, but it does have a significant effect on the rate of pressure drop
with time.
To date, limited information exists on the effect of SCC casting rate on the development of lateral pressure on
formwork. GTM Construction Company evaluated the effect of casting rates varying from 10 to 150 m/h on the
development of lateral pressure on formwork of different dimensions with length varying from 1.25 to 2.5 m, height
from 2.8 to 5.6 m, and width from 0.25 to 0.4 m. Two types of SCC mixtures using viscosity–enhancing admixture
(VEA) or not using VEA were studied. And the sand-to-total coarse aggregate ratio was fixed at 0.46, water content
was adjusted to secure slump flow values varying between 700 to 880 mm. For most of the tested mixtures, pressure
was found to be close to the hydrostatic pressure (Brite Euram, 2000).
Khayat, et al. (2005) conducted several experiments predicting the effect of casting rate on formwork pressure
of SCC. These experiments indicated that concrete acts as a fluid exerting almost hydrostatic head immediately
after filling. However a gradual decrease in lateral pressure takes place with
time. In his experiments the relative pressures determined initially and after 1, 2 and 3 hours were 98%, 89%
83% and 76% of hydrostatic pressure, respectively. Fig.1-A shows the lateral pressure on
formwork at different times. They also indicated that the reduction of the casting
rate from high (25 m/hr) to low (10 m/hr) results in slight decrease in the maximum pressure obtained right after
casting. Both casting rates then resulted in the same rate of pressure drop with time. Figure 1-B shows lateral
variations due to different casting rates on formwork.
(A) (B)
Another experimental investigation on the pressure on SCC on ICFs was carried out at structural laboratory of Peter
Kiewit Institute (PKI) at University of Nebraska-Lincoln at Omaha. The ICF wall panels were 48 in. (1200 mm) long,
16 in. (400 mm) high, and made of two layers of EPS that are 2.5 in. (63 mm) thick each. The two EPS layers are 6
in. (150 mm) apart and connected with eight plastic ties that are spaced 6 in. (150 mm) on center along the panel
length. The formwork was constructed for 8 ft. height to evaluate the strength of the commercial ICF blocks. This
resulted in a blowout of the bottom part of ICF due to the lack of strength against the hydrostatic pressure of 8
ft lift of SCC as shown in Figure 2.
In order to develop an ICF that can withstand the high pressure of SCC, allow for 8 ft high lifts, reduce the
shipping and storage cost, a job-built ICF was of developed using high density Expanded Polystyrene boards (EPS),
and glass fiber reinforced polymer (GFRP) threaded ties. The developed system can be easily and rapidly installed,
while being economically comparable to commercial ICF blocks. The
following subsections presents the material properties of the job-built ICF components,
system design, fabrication, testing, and cost analysis.
The GFRP threaded bars used as ties in the job-built ICF system are produced by BP Composites LTD. These bars
were chosen due to their high strength and low thermal conductivity. Table 1 lists material properties of these
bars as obtained from testing at the BP Composites LTD.
The EPS used in the developed system is produced by InsulFoam, Inc. InsulFoam XV is a high-performance
insulation consisting of a superior closed-cell, lightweight and resilient EPS. InsulFoam XV meets the requirements
of ASTM C578, Type XV, Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation. In addition,
InsulFoam XV offers a long-term stable R-Value and has excellent dimensional stability, compressive strength and
water resistance properties. Table 2 shows the typical tested physical properties for InsulForm XV. As the table
shows, R-value is higher than typical ICF walls (R-value =1.5 to 3.0) and the nominal density is
3.0 lb/ft3. InsulFoam XV is typically available in 4' x 4' and 4' x 8' sizes with thickness from 1/4" to 40" and
readily available in custom lengths and widths with little or no impact on lead time. InsulFoam XV is a
high-performance EPS product and is used in numerous applications requiring an insulation or fill material with a
high compressive strength.
According to NAHB (2001), commercial ICF walls of various types and thicknesses have flexural strength to resist
wind, seismic, flood water, and earth pressure (i.e., basement foundation wall) loads in the range of 200 to 400
pounds per square foot. Comparing the results of testing the job-built ICF specimen with typical ICF wall
clearly shows that the job-built ICF system has slightly higher strength than typical ICF walls. The range of 200
to 400 pounds per square foot is equivalent to a 280 to 395 mph (gust) wind event which implies an ability to
withstand a severe tornado (i.e., F3 or higher by Fujita tornado scale). This means the job-built ICF system has
enough capacity against a severe tornado.
Construction cost of job-built ICF system:
Like in any other construction environment, the cost of job-built ICF
construction is very dependent on the familiarity of the contractor and trade people with the
product. In most cases, there is a “learning curve” in any job- built construction process that requires building
several houses to eventually economize the overall approach to construction. Therefore, the experience of the
contractor is an important factor that will have an impact on cost and quality. Fortunately, job-built ICF
construction is a fairly simple method of construction using a system of conventional materials (i.e., concrete,
reinforcement, and insulation) and it is easily learned and understood by contractors, trade people, and
“do-it-yourselfers”. Table 3 provides the breakdown of the cost of job-built ICF system per square feet
calculated for only one job-built ICF wall (8 ft x 4 ft). This cost will decrease for larger walls. The RS Means
Residential Cost Data of 2009 average cost data for ICF wall is $ 5.72 per square foot
|